Two synthetic product examples

Review the commercial case and the terrain decision

See what each result depends on, what changes when a proposal is adopted, and what the next reviewer still needs.

These are two separate synthetic QA projects. The commercial case is not calculated from the nine-table terrain example. Displayed values are test assumptions, not customer results, current tariff or tax guidance, or large-site validation.

Chapter 1 · Commercial review

Keep the investment assumptions inspectable

The India C&I model compares a CAPEX ownership case with a RESCO case. The screen keeps discount, tax, depreciation, GST/ITC, maintenance and RESCO-rate assumptions beside the comparison and workbook control.

Use the customer's supported load and bill evidence and reviewed tariff basis. Check which case refers to the drawn design and which is a separate sizing recommendation; a recommendation does not silently change the layout.

NPV, IRR and LCOE help compare recorded assumptions. They are not savings guarantees. Rates shown in this August 2026 test capture are illustrative and require project-specific review.

Synthetic India C&I investment case showing CAPEX and RESCO assumptions, comparison metrics, and a workbook export control.View full-size screenshot
Synthetic C&I example, captured 16 August 2026. Displayed tax rates, costs and results are test assumptions, not current guidance or customer savings.

Chapter 2 · A separate fixed-table study

Compare the proposed surface with the recorded ground

This small authored study uses a 20 m × 20 m boundary, four flat elevation controls and nine horizontal fixed tables. A named grading option defines a flat plane at +1 m in the same local vertical basis.

Saving the option stores its definition. It does not reshape the original terrain or move the tables. Reopen it and run the comparison against current inputs, then inspect supported area, cut-and-fill quantities and table clearance.

The view combines original and proposed surfaces with purple outlines for a height proposal. It is a review preview. Interpolated ground, sampled clearance and plane quantities do not establish surveyed accuracy, foundation capacity, drainage design or civil approval.

Nine synthetic fixed tables above recorded terrain, with a proposed grading surface and purple height-preview outlines.View full-size screenshot
Synthetic nine-table study, captured 10 September 2026. The proposed surface and table outlines are a review preview.

03 · Review before adoption

Make eligible table-height changes deliberately

The recorded example proposes a +0.5 m offset for each of the nine tables. The designer reviews eligible and excluded tables before adopting the height changes in one undo action.

Adoption updates eligible table heights and supports while preserving original terrain controls, XY geometry and the saved grading definition. Recalculate affected evidence after the change; old results must not be treated as current.

Direct sunlight has a separate basis. At a 30° sun elevation and 800 W/m² direct normal irradiance, the horizontal tables receive a mean incident direct irradiance of 400 W/m² before and after this uniform height change. This is one configured instant, not electrical watts or annual kWh; it excludes diffuse/reflected light and module/electrical response.

Synthetic fixed-table study with the review checkbox, eligible height changes, and an adoption control.View full-size screenshot
Synthetic nine-table study. Adoption requires review and moves eligible tables; original terrain and the saved grading definition remain recorded.

Reusable synthetic inputs

Inspect the four controls behind the terrain example

The CSV reproduces the exact four elevation-control rows used by the release QA fixture. Coordinates are project-local XY metres; elevations use a synthetic local benchmark. These are authored points, not an independent survey.

Importing the CSV supplies elevation controls only. It does not create the boundary, tables, saved grading option, commercial case or reports. The setup notes record those fixture parameters separately.

This page is a printable walkthrough, not an exported engineering report. Use your browser's Print command to save the guide.

See PVspark in action

Bring a representative project to the discussion

We will identify the commercial or engineering decision, supported inputs and review output to evaluate together.

Essential security and preference storage remains available. Optional analytics is off unless you allow it. See cookies and storage.